UPS Dummy Load TestDarui Electric recommends for youMain Features: 1. Combined Performance: The ZDC series automatic AC load bank has the dual functions of AC dummy load and measuring instrument.
2. Test Items: Output power and various performance index parameters of generator sets, UPS, and generators.
3. Power Consumption Element Performance: The AC load bank uses stainless steel alloy columnar pure resistive power consumption elements, which have excellent thermal temperature coefficient, good consistency, and a power factor of over 0.99.
4. Perfect Load Heat Dissipation System: The load bank adopts forced air cooling, with high-power axial fans featuring low noise and long life, ensuring reliable heat dissipation of the equipment.
Main Technical Performance and Parameters 1. Load Voltage: AC380V/50HZ (three-phase four-wire, line voltage 380V, phase voltage 220V)
2. Power Factor: 1 (pure resistive load)
3. Installed Capacity: 100kw
4. Working Power Supply: Single-phase AC220V/50HZ
5. Applicable Temperature Range: -10~40℃
6. Cooling Method: Forced air cooling
7. Display Method: LCD screen display, showing parameters such as AC voltage, AC current, power, power factor, frequency, etc.
8. Loading Method: Continuous loading
9. Operation Method: Keyboard operation
10. Control Method: Microcontroller control.
11. Dimensions: Subject to actual dimensions.
Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.